7.2.2                 General requirement

a.              If the design does not fulfil clause 6.3, then an analysis shall be made and an EMC test approved by the customer shall be defined to cover the expected discharge level.

NOTE              EMC test specifications can originate in ISO 14302 or ECSS-E-ST-20-07.

b.              If the design does not fulfil clause 6.3, then testing of solar arrays shall be carried out as described in section 7.2.3.